NRG Boat update 11-05-08

Chattanooga Fishing Forum

Help Support Chattanooga Fishing Forum:

NRG

Well-known member
Joined
Feb 14, 2006
Messages
1,988
Location
?
Ok the outside stringers are done, the main support brackets are curing as we speak, the rear cross braces 2 on the transom and two on either side if transom, go in tomorrow, and then I can finish cutting out the middle stringer and dry fitting the new one on Sat.

I may need to borrow some more halogen work lights from someone to make more heat on Sat .. I have 3 but only high of 61 on sat, so I may need a couple more to keep the temp up above 65 for 5 - 7 hrs.

So Then all I have left is putting in 2 part foam, some new some will be reused , and then the floor sections glassed and put in. Then the top back on!
I still need to raise another 100 bucks for the foam and one more 4x8 sheet of 1/2 inch plywood.

anyone need retail or restaurant weekend help for a few weekends so I can raise some extra cash emoScratch emoSmile

I also before the top goes back on need to buy new thru hull fittings for live well and bilge pump and the front live well drain, the broke taking off the top.

I will post pics after I get the middle stringer in , my camera batteries died
 
Here is pics as of today .. got home late only had time to get a couple of the transom cross supports cut, too tired to go further tonight

P1010002-8.jpg
 
Back
Top